Case Study
Zambia Copper Project
A 10,000-tonne-per-year hydrometallurgical copper plant in Zambia — invested and delivered by Deyuan as a working demonstration of our metallurgical solution and design capability.
Location
Zambia
Capacity
10,000 t/yr copper cathode
Process
Hydrometallurgy · Solvent extraction / electrowinning (SX-EW)
Scope
Investment · process design · reagent supply
Plant photos to be added
A working proof of capability
Beyond supplying reagents, Deyuan designs and delivers metallurgical solutions. Our investment in a 10,000 t/yr hydrometallurgical copper plant in Zambia puts that capability into practice — from process design to the solvent-extraction reagents that run it.
The project is a reference for what we can do for your operation: engineering a reliable extraction circuit, supplying the chemistry, and getting to production.